Jimblebar Iron Ore Mine

Jimblebar Iron Ore Mine from Ferro-Clean Pty Ltd

By: Ferro-Clean Pty Ltd  10-Jul-2014
Keywords: Spray Painting, Abrasive Blasting, Industrial Painting

The recently opened $3.2 Billion mine that will bring BHP's iron ore capacity to 220 million tonnes per annum. In February 2012, BHP approved a $3.6bn iron ore mine development near Newman. Over 1500 tonne of steel and 6km of handrail required fabrication and painting locally. The project required a 2.5 class blast, then an Ethyl Silicate Zinc applied to 75 microns – this is suitable for typical mine-site structures in non-corrosive areas like the Pilbara, which are classified as ‘rural arid environments’. The job required rigorous inspection to ensure it met the specifications without deviation, and - as with most rapid growth projects – it was needed in a short timeframe. Read more at: http://www.ferro-clean.com/case-studies/jimblebar-iron-ore-mine/

Keywords: Abrasive Blasting, Blast Cleaning, Industrial Painting, Protective Coatings Application, Spray Painting,

Contact Ferro-Clean Pty Ltd


Print this page

Other examples of best work from Ferro-Clean Pty Ltd

Perth Arena from Ferro-Clean Pty Ltd thumbnail

Perth Arena

Perth’s $550m Entertainment Complex required quality protective coatings to stand the test of time. Read how Ferro-Clean’s capacity and ability to process large and complicated items with high quality and fast turn-around meant the protective coatings stage went like a dream.