High Voltage cable lowering from an above ground 11kV RMU to an underground substation 400M below

High Voltage cable lowering from an above ground 11kV RMU to an underground substation 400M below from MPS Building and Electrical

By: MPS Building and Electrical  12-Oct-2011
Keywords: Mining, Electrical, Underground Mining

MPS are experienced in the process of lowering underground services. High voltage cables and Fibre Optic cables are lowered and grouted in place to give power and communications to the underground minig area.  

Keywords: Electrical, Mining, Underground Mining

Contact MPS Building and Electrical

Email

Print this page