Gateway Bridge Duplication Project

By: Durinox Stainless Steel Reinforcing  02-Feb-2011
Keywords: Processing Equipment, Stainless Rebar, Stainless Steel Reinforcing

"Durinox Stainless Steel Reinforcing" processed 38 tonnes of 16mm stainless steel deformed bar to be used on the Gateway Bridge Duplication Project. The stainless was bent to shape and cut to length by Durinox, then delivered to Humes precasting yard for assembly into panels. These panels are used around the bases of the two peirs as crash barriers. Being that the cover on these panels was 75mm and the design life of the bridge was to exceed 300 years, stainless steel reinforcing was the obvious choice.